SEMSWA conducts many drainage related projects both in and around our drainageways and stormwater infrastructure system. These projects include improvements such as bank stabilization, wetlands, channel stabilization and improvements, pond construction and cleaning, and pipe rehabilitation. These projects help ensure proper stormwater drainage and reduce the risk of flooding and property damage, and protect water quality. Below is a series of before and after photographs that illustrate these projects.